The technical team of FANGKUAI Boiler is particularly strong. They listened carefully to our needs and created a systematic solution for us. The boiler took only 35 days from production and transportation to on-site installation and commissioning, and all the links were processed. The boiler was soon put into use.
Kazakhstan has abundant oil resources and has also produced many oil drilling equipment manufacturing enterprises. The company that cooperates with FANGKUAI Boiler is a high-tech enterprise integrating design, manufacture and sales of oil drilling equipment. The technicians of FANGKUAI Boiler fully grasped the company's needs through remote telephone and network communication, and customized a fuel steam boiler (WNS1.5-1.0-YQ) with a capacity of 1.5 tons. By commissioning to official operation, the boiler can fully load the company's new production line requirements.
This series of boilers is a star product of FANGKUAI. The PLC intelligent control system is integrated with the hardware equipment. The boiler has a high intelligence "brain". Users only need to adjust the control system to complete the boiler departure, regulation, and shutdown. The boiler has installed more than 10 probes in various important positions such as water level, water temperature and pressure, and monitors the boiler operating status in real time. Once a sudden failure occurs, the warning device can be activated immediately to remind the user to deal with the accident immediately and reduce economic losses.