Myanmar
35t/h steam boiler
The cooperation with Zhengzhou Fangkuai Boiler this time is a rubber factory in Myanmar. As the main production medium and heat carrier in the production process of this enterprise, steam is widely used in all aspects of raw material heating and dehydration, equipment preheating, water heating, and product vulcanization. Considering the high proportion of steam consumption cost in production, how to control the production of steam at the lowest cost, use the steam with the best effect, and manage the steam with the most scientific method is very important. The technical engineer of Zhengzhou Fangkuai Boiler has calculated through careful calculations, and customized a steam boiler (SZS25-2.5-Y.Q) with an output of 35 tons/hour for it, which can fully meet the steam demand of the enterprise.
More
China
15t/h steam boiler
The company cooperating with Zhengzhou Fangkuai Boiler this time is a dairy product processing plant in Hefei, Anhui Province. In the production process of dairy products, a large amount of steam is required for multiple processes such as sterilization, concentration, and drying. Therefore, the stable operation of the steam boiler has a direct impact on its production. With its outstanding advantages in products and services, Zhengzhou Fangkuai Boiler has stood out among many competitors and provided it with three WNS series 15-ton condensing gas-fired steam boilers (WNS15-1.25-Y.Q).
More
China
70MW hot water boiler
The Fangkuai Boiler proposed to provide a 70MW gas-fired hot water boiler (SZS70-1.25-Y.Q) for the 2022 Zhangjiakou Winter Olympics venue. At present, the boiler is in place on the project site. After careful organization and planning by the project department, a thorough and scientific hoisting plan and safety measures have been formulated in advance. It took several hours to successfully hoist this "big guy" in place, ensuring the auxiliary supporting projects for the Winter Olympics. Overall progress.
More
China
5.6MW hot water boiler
The cooperation with Zhengzhou Fangkuai Boiler this time is a heating station located in Tianjin. The heating station is mainly responsible for winter heating of a total of 80,000 square meters of residential areas in the surrounding area. In combination with my country's current increasingly stringent environmental protection policies, the heating station urgently needs to phase out the original coal-fired boilers and replace them with new gas-fired hot water boilers. The heating period in the north is relatively long, and the heating station is very concerned about the stability of the boiler operation. If there is a problem, it is difficult to guarantee the normal heating of users. For this reason, the heating station is also very cautious in purchasing boilers. After inspecting many manufacturers, the company decided to cooperate with Zhengzhou Fangkuai Boiler to provide it with a gas-fired hot water boiler (SZS5.6-2.5-Y.Q) with an output of 5.6-MW.
More
China
7MW hot water boiler
The cooperation with Zhengzhou Fangkuai Boiler this time is a food processing plant located in Jinan City, Shandong Province. In Shandong, the use of hot water boilers for central heating is the only way for heating in winter. The food processing plant has a total plant area of about 100,000 square meters. Before the upcoming heating season, the company urgently needs to purchase a hot water boiler to heat the plant. After comparing many boiler plants, we chose to cooperate with Zhengzhou Fangkuai Boiler to provide it with a 7MW gas-fired hot water boiler (WNS7-1.25-Y.Q).
More
China
1.75MW hot water boiler
The cooperation with Zhengzhou Fangkuai Boiler this time is a heating company located in Yushu City, Qinghai Province. Yushu Tibetan Autonomous Prefecture is a jewel next to Kunlun Mountain. The unique alpine climate makes the local average daily minimum temperature only -3 degrees, with a total of 283 days of rainy weather throughout the year and 22 days of snowfall. "Electric boiler, long heating cycle, used by Tibetans in Tibetan areas, and local plateau environment." Many keywords were quickly converted into data indicators on CAD drawings. With the R&D center as the main body, the company quickly formed a project team. Started boiler design. After careful consideration of the existing products, the R&D personnel determined to meet the needs of the other party in the form of an electric vacuum hot water boiler (WDR1.75-95/70-Ⅱ).
More