What materials should be prepared when the boiler needs to be shut down?

What materials should be prepared when the boiler needs to be shut down?

For enterprise units, the boiler may not need to be used 365 days a year. When the construction period is stopped, the boiler is no longer needed, so the boiler needs to be shut down. What materials should be prepared when the boiler is shut down? To which organs should you report to? Specifically, listen to the boiler experts of Zhengzhou Fangkui Boiler Company to explain to you.

What report should be submitted to the Boiler Inspection Office when the boiler is shut down?

If the boiler is shut down, it is necessary to submit a "Boiler Deactivation Report" to the Boiler Inspection Office. Its main purpose is to be used as an annual inspection type of the boiler, which can be used to prove that it is not in use. Inspection fees, and safety valve verification fees, etc.

In addition, the specific content of the "Boiler Decommissioning Report" mainly includes the company name, boiler number, boiler use registration number, boiler model, number and use, etc. In addition, the reasons for stopping the furnace and the safety protection measures when the boiler is stopped are also indispensable.

company news