The portable boiler is a new type of boiler, which can solve the problems of bulky bulk, difficult movement and high labor intensity of the existing boiler, and is a more convenient boiler equipment.

The portable boiler is completed in an easy-to-transport container with 100% external connection and the user does not have to complete the installation. The boiler system is built on a steel container and a fully movable chassis; all components are pre-wired and run together as a unit.

Built around the operator

Our portable boiler rooms are built by boiler operators, for boiler operators. The equipment is positioned for maximum ease of use and the fastest integration possible. Valve handles and gauges are easily identifiable and easily accessible. User interfaces are in comfortable locations. Filters and strainers are installed in places that are easy to service. Ample LED lights are installed in strategic positions.

The entire system is designed to mimic the organization and function of a full scale boiler plant, but in a greatly reduced footprint.

Application

  • Disaster management
  • Universities
  • Building projects
  • Schools and colleges
  • Emergency heating and hot water
  • Hotels and leisure
  • Health centres
  • Commercial and industrial
  • Hospitals and care homes
  • Local authority and public sector

fangkuai portable boiler

  • 1. No matter what the situation of the user is, you can provide a portable boiler room with complete packaging and complete components.

  • 2. The movable boiler adopts a modular design, which does not increase the operation and cost while fulfilling the performance requirements you need.

  • 3. If you are in a low temperature environment, we can also spray the insulation material in the wall without causing heat loss to the boiler.

  • 4. We install stairs that meet OSHA and IBC standards for portable boilers to facilitate your operation of the boiler.

Traditional boiler

  • 1. No matter what the situation of the user is, you can provide a portable boiler room with complete packaging and complete components.

  • 2. The movable boiler adopts a modular design, which does not increase the operation and cost while fulfilling the performance requirements you need.

  • 3. If you are in a low temperature environment, we can also spray the insulation material in the wall without causing heat loss to the boiler.

  • 4. We install stairs that meet OSHA and IBC standards for portable boilers to facilitate your operation of the boiler.

  • 1 Water tank
  • 2 Pump
  • 3 Water Softener
  • 4 Burner
  • 5 FANGKUAI Boiler
  • 6 Economizer
  • 7 Chimney
  • 8 Mobile Container

Comparison: 10t/h Boiler Plant vs 10t/h Portable Boiler Room

Typical Boiler Plant

Footprint: 2,500 square feet

10%

Construction time: 24 weeks

10%

Cost: $2,100,000

10%

Portable Boiler Room

Footprint: 424 square feet

10%

Construction time: 8 weeks

10%

Cost: $500,000

10%

  • How long does it take to prepare the portable boiler and auxiliary equipment from the current location to the target location?

    Mr.Li FANGKUAI Technical Engineer

    It takes about 2 hours.

  • Must the boiler drain in advance for transportation needs?

    Mr.Li FANGKUAI Technical Engineer

    No,the boiler water can move completely with the boiler,however,the boiler must be decompressed and the storage tank may need to be drained,it is dependent on the amount of water inside the boiler.

  • How long does it take for the boiler to reach the operating pressure from cold start?

    Mr.Li FANGKUAI Technical Engineer

    The working pressure from cold start to 100 psi takes about 45 minutes.

  • How long does it take to add water to the feed water storage tank?

    Mr.Li FANGKUAI Technical Engineer

    The feed water storage tank can store 6 cubic meters of drinking water, usually using closed-circuit steam for 10-14 days, and the steam cycle returns the condensed water to the water storage tank.

  • What are the requirements for water quality when the boiler feed water storage tank is replenished?

    Mr.Li FANGKUAI Technical Engineer

    Boiler feed water must use an uncontaminated drinking water delivery system to transport water. All water must be inspected before it flows into the boiler feed water storage tank.

MESSAGES

Contact us for more details about our boilers, solutions and services.

Hot water/oil Steam

DO YOU HAVE QUESTIONS? WE ARE HERE TO HELP YOU!